2003 Jubliee Signage Project
The Emergency Services requested that every bridge along the newly constructed channel should be identifiable both from the bank and the channel itself. Bridges and signs were grouped into several types Brick built Road Bridges with oval signs Brick built Railway Bridges with hump back signs Concrete vehicular access Bridges with long signs riverside with numerals at each of bridge Pedestrian only Bridges with long signs riverside with numerals at each of bridge Bridges with Bridleways with long signs riverside with numerals at each of bridge Signs fitted on the river sides of Bridges required to be fixed in place by absailing down from the parapets in the majority of cases. In total 22 bridges were named and numbered, Brick Built Road Bridges required 4 signs each. All cast aluminium signs were manufactured to order from a specialised source namely Ridgequest of Croft Lincolnshire ( www.ridgequest.co.uk ). |
|
|
![]() |
![]() |
|
![]() |
![]() |
![]() |
| A selection of “Numbers” at end of each Foot and Bridleway Bridges |
|
![]() |
![]() |
![]() |
![]() |
Halcyon Solutions, Lawday Link, Upper Hale, Farnham, Surrey. GU9 0BS
Tel/Fax: 01252 715765 contact us Email: Halcyon-Solutions
If you experience any problems with this site, then please contact the Webmaster .